01
Angul, Odisha, 2022
RCC chimney, 256 m, 50 m width. Controlled blasting. Fall corridor set for a tall shell on a constrained industrial site.
Projects · Chimneys
A chimney on a live station is not a building. The work turns on fall direction, a designed hinge, and a cleared corridor.
Survey, hinge, and firing stay with the same manpower. Fleet on site is EXIQUDE fleet.
01
RCC chimney, 256 m, 50 m width. Controlled blasting. Fall corridor set for a tall shell on a constrained industrial site.
02
Stage-I RCC chimney, 135 m. Controlled blasting, one sequence. Stage-II unit stayed on load. Fall corridor agreed before the blast.
03
Two chimneys. Controlled blasting. Both shells felled in the same sequence. Works around them stayed.