Chimneys

A chimney on a live station is not a building. The work turns on fall direction, a designed hinge, and a cleared corridor.

Survey, hinge, and firing stay with the same manpower. Fleet on site is EXIQUDE fleet.

Contact us

01

Angul, Odisha, 2022

RCC chimney, 256 m, 50 m width. Controlled blasting. Fall corridor set for a tall shell on a constrained industrial site.

ChimneyControlled blasting256 m

02

NTPC Kanti, 2026

Stage-I RCC chimney, 135 m. Controlled blasting, one sequence. Stage-II unit stayed on load. Fall corridor agreed before the blast.

ChimneyLive unit135 m

03

UKAI TPS, 2024

Two chimneys. Controlled blasting. Both shells felled in the same sequence. Works around them stayed.

Two chimneysSame sequence